306 Ne 2ND St, Delray Beach

Case 2023-196 · Site plan · Mixed-use · City of Delray Beach

aerial view

Under staff review.

Get the free brief for City of Delray Beach

The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.

Your market:
Free. Public-record links. Unsubscribe anytime.

In short

The applicant requests approval of a Level 4 Site Plan for a four-story, 45,247 square-foot mixed-use building with 23 residential units and 2,651 square feet of retail space, including waivers for landscape buffer reduction and off-street loading elimination.

The first line of the written brief, synthesised from this case's filed documents. The full brief is in the subscriber case file.

The request, as filed

The Maxwell (2023-196): Provide a recommendation to the City Commission on a Level 4 Site Plan application for a four-story, 45,247 square-foot mixed-use building at 306 NE 2nd Street, known as The Maxwell, including Architectural Elevations; a Landscape Plan, with an associated landscape waiver to the required five-foot perimeter landscape strip; and a determination of adequacy for reduction of required off-street loading. Address: 306 NE 2nd Street PCN: 12-43-46-16-01-090-0250 Applicant/ Owner: GS Deerfield LLC...

The source's own wording of the request, unedited.

The facts on file

Case number2023-196
Address306 Ne 2ND St, Delray Beach
Case typeSite plan
ProductMixed-use
Site size0.86 acres
JurisdictionCity of Delray Beach

The story so far

July 31, 2024Introduced (Planning and Zoning Board)
June 9, 2025Introduced (Planning and Zoning Board)

Dates and wording are the source's own. Sources publish late and amend; the official record is the authority.

What this case is

Site plan. A site plan is the detailed layout of a specific project on land that already has the zoning for it: the buildings, parking, drainage, access and landscaping. Most jurisdictions review it administratively or before a review committee, so it can move without a public hearing. Site plan approval is usually the last land use step before building permits. A permit, not the site plan, is what authorizes construction.

Who decides what on this record:

The official record

Open the official record →

Nearby cases in City of Delray Beach

In the subscriber case file

See The Tracker · Watch the tool work on the free sample map

Get the free brief for City of Delray Beach

The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.

Your market:
Free. Public-record links. Unsubscribe anytime.
Compiled by machine from public records. Sources publish late, amend, and occasionally err; verify against the official record before relying on anything here. Not legal advice, a survey, or an appraisal.