Case DEV2025-428 · Site Plan (major) · Industrial / logistics · City of Daytona Beach
Approved in October 2026.
The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.
Major. This project proposes the construction of phases 1 & 2 which include ±305,550 sqft of warehouse & distribution facilities along with all associated parking, utility and stormwater infrastructure.. Case family: Site Plan.
The source's own wording of the request, unedited.
| Case number | DEV2025-428 |
|---|---|
| Project name, as filed | Florida Logistics Center (Phase 1 & 2) |
| Case type | Site Plan (major) |
| Product | Industrial / logistics |
| Site size | 110.98 acres |
| Approved | October 20, 2026 |
| Jurisdiction | City of Daytona Beach |
| October 20, 2026 | Approved |
Dates and wording are the source's own. Sources publish late and amend; the official record is the authority.
Site plan. A site plan is the detailed layout of a specific project on land that already has the zoning for it: the buildings, parking, drainage, access and landscaping. Most jurisdictions review it administratively or before a review committee, so it can move without a public hearing. Site plan approval is usually the last land use step before building permits. A permit, not the site plan, is what authorizes construction.
This source publishes no per-case link. Search the case number on the jurisdiction's own portal to pull the file.
Every other tracked case on the same parcel, oldest first. A site's story usually runs across several cases.
| October 15, 2025 | Planned Development DEV2024-378 approved |