Case MNSP-25-3 · Minor Development Plan · Industrial / logistics · City of Stuart
1527 Ne Cardinal Ave, Jensen Beach · aerial view
Approved in April 2026.
The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.
Minor Development Plan. Construct a 1,200 SF prefabricated building for storage of supplies and materials.. We are requesting help to permit a 30' x 40' prefabricated building to store work-related products, supplies, and materials for our windows and sliding glass doors. The new building site will have a concrete slab with engineered footer and a 1,200 ft. storage building top.. Zoning district: B-4: Limited Business/Manufacturing. Land use category: INDUSTRIAL. Development order: Natural Flow, INC - MNSP-25-3....
The source's own wording of the request, unedited.
| Case number | MNSP-25-3 |
|---|---|
| Project name, as filed | Natural Flow |
| Address | 1527 Ne Cardinal Ave, Jensen Beach |
| Case type | Minor Development Plan |
| Product | Industrial / logistics |
| Site size | 1.14 acres |
| Approved | April 22, 2026 |
| Jurisdiction | City of Stuart |
| April 22, 2026 | Approved |
Dates and wording are the source's own. Sources publish late and amend; the official record is the authority.
Site plan. A site plan is the detailed layout of a specific project on land that already has the zoning for it: the buildings, parking, drainage, access and landscaping. Most jurisdictions review it administratively or before a review committee, so it can move without a public hearing. Site plan approval is usually the last land use step before building permits. A permit, not the site plan, is what authorizes construction.
This source publishes no per-case link. Search the case number on the jurisdiction's own portal to pull the file.
See The Tracker · Watch the tool work on the free sample map
The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.