Case SPIN-24-0004 · Site Plan Modification · Commercial / retail · City of Port Orange
4590 Ridgewood Ave, Port Orange 32127 · aerial view
Approved, no recent activity. Approved in February 2024.
The free brief covers new filings in this jurisdiction. It does not send a separate email for any one case.
Site Plan Modification. Demolish the existing convenience store and construct a new ±4,712 sq.ft. convenience store in in the rear undeveloped portion of the site and relocated the gas pumps under a covered canopy. The proposed site modification requires the overall site to be brought up to code which will require stormwater drainage, the addition of landscape buffers and interior landscaping, a fence along Monroe Place, and a sidewalk along Fox Place.. Status detail: Under Staff Review.
The source's own wording of the request, unedited.
| Case number | SPIN-24-0004 |
|---|---|
| Project name, as filed | APEC Virginia Heights Marathon Gas |
| Address | 4590 Ridgewood Ave, Port Orange 32127 |
| Case type | Site Plan Modification |
| Product | Commercial / retail |
| Site size | 1.29 acres |
| Approved | February 21, 2024 |
| Jurisdiction | City of Port Orange |
| February 21, 2024 | Approved |
| March 13, 2024 | Staff Development Review hearing |
Dates and wording are the source's own. Sources publish late and amend; the official record is the authority.
Variance or deviation. A variance grants relief from one specific rule for one site, such as a setback, a height limit or a parking count, without changing the zoning. It is decided by a zoning board after a hearing, on a showing that the site has a hardship the rule did not anticipate. A variance by itself does not approve a project. It removes one obstacle for the site plan or permit that follows.